Washington State Department of Transportation (WSDOT) will be fixing potholes and repairing the road between the Preston interchange at Southeast 82nd Street and Highlands Drive in Issaquah. Expect long delays and disruption, please plan accordingly. Follow the WSDOT blog for more detailed information. See information on upcoming closures below.
Late April-May Closures
April 30-May 3 Closure
- Date/time: April 30 at 10 p.m. through May 3 at 7 a.m.
- Location: WSDOT will reduce a section of eastbound I-90 east to one lane around the clock. The construction will be 1 mile west of the Preston interchange (see map below).
- Purpose: Fix potholes, repair pavement, replace bridge deck
The lane reduction provides a safe work area for the people repairing I-90. These are a continuation of repairs WSDOT began in summer 2022.
May 5-8 Closure
- Date/time: May 5 at 10 p.m. through May 8 at 5 a.m.
- Location: WSDOT will reduce a section of westbound I-90 to one lane around the clock. The construction will be just west of the Highlands Drive Northeast interchange (see map below).
- Purpose: Fix potholes, repair pavement, replace bridge deck
The lane reduction provides a safe work area for the people repairing I-90. These are a continuation of repairs WSDOT began in summer 2022.
People who are traveling can get real-time traffic information on mobile phones with the WSDOT traffic app and by following the WSDOT traffic Twitter feed.
